连续监视式报警系统和巡回监视式报警系统。连续监视报警系统是指单元组合式集中监视报警系统,是连续地同时监视机舱中所有检测点的工作状况。每个检测点都需要一个独一的报警控制单元,各监视点报警电路互相独立,互相影响小,增、减报警监视点数不受影响。巡回监视报警系统是以一定时间间隔依次巡回检测各监视点的状态,对每个检测点进行分时、间断处理,所以。不论有多少个监视点。只需一个中央处理单元即可 那位高人能帮我翻译一下!!!(船舶专业英语)专业的翻译:ANCHOR AND MOORING ARRANGEMENT 锚与系泊安排2210 Anchors and Chains, Hawse and Chain Pipes 2210 锚与链条,锚链孔与链筒The vessel will be equipped with two (2) Pool anchors, and connected to studlink chain cable of high tensile steel (56 mm K3) according to the rules of the classification society. The minimum total chain length shall be 577,5m, equally divided over both sides (PS and SB). 根据船级社的规定,每艘船舶配备两个波尔锚,连接到高强度(56mm K3)的横档环链,其总长度为577.5米,均分在左舷和右舷。Anchors to be stowed in reinforced anchor pockets. A spare anchor has to be provided. Arrangement of hawse pipes and anchor pockets will be in such a manner that a safe dropping and a proper storing of anchors is guaranteed. 两个锚需装进加固的锚穴里,并有一个备用锚。锚链筒与锚穴的位置安排必须保证抛锚的安全与锚的适当存放。Hawse pipes to be designed to have sufficient clearance between the bulbous bow and the anchor flukes. The anchor shall fall free at ship’s heel of 3°. Galvanised, hinged type steel covers will be fitted for the hawse pipes. Canvas covers for the spurling pipes. A washing down system will be installed in the hawse pipes. 锚链筒的设计应确保球型艏与锚爪之间留有足够的余隙;抛锚线以船倾斜度3°下降。锚链筒配有镀锌的铰式铁盖。锚链筒中安装一个冲洗系统。2220 Mooring and combined Windlass / Mooring Winch 2220 系泊及起锚机与系泊绞车组合Mooring and combined Windlass/Mooring W inch: 2 (two) hydraulic (high pressure) driven combined windlass/automatic tension-mooring winches will be installed on forecastle deck. Each winch consists of: • One cable lifter with spindle band 【break】brake • One mooring split drum of the automatic-self-tensioning type, mooring pulls 120 kN • One warping head according to rules • Design, traction force and speed of each windlass units according to classification requirements. The driving equipment for one windlass consists of: • One hydraulic motor with mounted brake, • Hydraulic pump; unit with standstill heating and heat exchanger for cool-ing (by air); • one switch cabinet with standstill heating. • One anchor cable stopper of the roller type is provided for each anchor cable. • Additional hook, lashing bar and turn buckle to be provided for stowage in sea condition. • One control stand will be arranged for each winch at the bulwark. • Mooring lines have to be provided at the bulwark系泊及起锚机与系泊绞车组合:在艏艛甲板上安装两套高压的液压驱动起锚机/自动张力绞车。每个绞车配有: 一座以锭绳制动的起锚机; 一座自动张力式的分筒绞车,系泊绞盘拉力120 kN; 一个符合规定的绞缆筒; 每套起锚机的设计、牵引力及速度符合船级社的要求;每套起锚机的驱动设备包括: 一付安上制动的液压马达; 液压泵,配有静止加热及用作空气冷却的抽热风机; 一个配有静止加热的开关箱; 每条锚链配有一个滚筒式锚链扣; 海况装载所需的额外链钩、拉系杆及松紧螺旋扣; 每个在舷墙的绞车安排一个操纵台; 舷墙必须备有系泊缆。Poop Deck: 2 (two) hydraulically (high pressure) driven automatic tension-mooring winches will be installed on Poop deck. The winches will have one mooring split drum of the automatic-self-tensioning type, mooring pull 120kN One warping head according to rules The driving equipment for one winch consists of: • One hydraulic motor, with mounted brake, • Hydraulic pump unit with standstill heating and heat exchanger for 【colling】cooling water (LT water) • One switch cabinet with standstill heating • One control stand will be arranged for each winch.艉艛甲板:艉艛甲板上安装两个高压的液压驱动有自动张力的系泊绞车。绞车是自动张力式的分筒绞车,系泊绞盘拉力120 kN;一个符合规定的绞缆筒。每个绞车的驱动设备包括: 一付安上制动的液压马达; 液压泵,配有静止加热及用作冷却水的换热风机(低温水); 一个配有静止加热的开关箱; 每个绞车安排一个操纵台。 锚及系泊布置2210锚和链,锚链孔和链管该船将装备2(2)游泳池锚,并连接到studlink链的高强度钢材(56毫米K3的)按照船级社的规则电缆。 The minimum total chain length shall be 577,5m, equally divided over both sides (PS and SB). Anchors to be stowed in reinforced anchor pockets.最低总额链的长度应为577,5米,同样对双方分歧(私人秘书和SB)。锚应在钢筋锚口袋存放。 A spare anchor has to be provided.阿备用锚,必须提供。 Arrangement of hawse pipes and anchor pockets will be in such a manner that a safe dropping and a proper storing of anchors is guaranteed. Hawse pipes to be designed to have sufficient clearance between the bulbous bow and the anchor flukes.管道的锚链孔和锚口袋安排将在这样一个安全和适当的下降锚储存有保障。锚链孔管在设计上必须有与球状船首锚吸虫和足够的通关方式。 The anchor shall fall free at ship's heel of 3°. Galvanised, hinged type steel covers will be fitted for the hawse pipes.锚应属于免费船的弱点3 °。镀锌,铰链型钢包括将用于锚链孔管道安装。 Canvas covers for the spurling pipes. A washing down system will be installed in the hawse pipes.帆布覆盖了斯珀林管道。甲降低系统清洗将在锚链孔管道安装。 2220 Mooring and combined Windlass / Mooring Winch Mooring and combined W indlass/Mooring W inch: 2 (two) hydraulic (high pressure) driven combined windlass/automatic tension- mooring winches will be installed on forecastle deck. Each winch consists of: • One cable lifter with spindle band break • One mooring split drum of the automatic-self-tensioning type, mooring pulls 120 kN • One warping head according to rules • Design, traction force and speed of each windlass units according to classification requirements. The driving equipment for one windlass consists of: • One hydraulic motor with mounted brake, • Hydraulic pump; unit with standstill heating and heat exchanger for cool- ing (by air); • one switch cabinet with standstill heating. • One anchor cable stopper of the roller type is provided for each anchor cable. • Additional hook, lashing bar and turn buckle to be provided for stowage in sea condition. • One control stand will be arranged for each winch at the bulwark. • Mooring lines have to be provided at the bulwark Poop Deck: 2 (two) hydraulically (high pressure) driven automatic tension-mooring winches will be installed on Poop deck. The winches will have one mooring split drum of the automatic-self-tensioning type, mooring pull 120kN One warping head according to rules The driving equipment for one winch consists of: • One hydraulic motor, with mounted brake, • Hydraulic pump unit with standstill heating and heat exchanger for colling water (LT water) • One switch cabinet with standstill heating • One control stand will be arranged for each winch. 2220系泊和组合起锚机/系泊绞车系泊和联合糯indlass /泊糯英寸:2(2)液压(高压)驱动相结合卷扬机/自动张力,系泊绞车将被安装在船首甲板。每个绞车包括:•一电缆轴带升降打破•一个泊分裂鼓自动自我张拉式,系泊拉120千牛•一整头按照规则•设计,牵引力和速度各卷扬机单位按照分类要求。设备的驱动一个绞盘包括:•一个与安装制动液压马达,油压泵•;与停顿与停顿加热单元加热和冷却换热荷兰国际集团(航空)•一个开关柜。•一个锚的辊电缆塞子类型是提供每个锚索。•附加钩,绑扎酒吧,把扣将在海上装载规定的条件。•一个管制站将在每一个堡垒。•泊线已经绞车安排将在堡垒提供船尾甲板:2(2)液压(高压)驱动自动张力,系泊绞车将被安装在船尾甲板上。该绞车将有一个锚分裂鼓自动自我张拉式,系泊拉120kN一整头按一个绞盘规则的驾驶设备包括:•一个液压马达,与安装制动器,液压与停滞•加热和热科林水(审裁处水)•一个开关,瘫痪加热•一个控制柜换热站水泵机组将安排每个绞盘。 |
上一篇:船舶监测报警系统 | 下一篇:我喜欢摄影、想买一个无人机俯瞰世界美景、是否要飞行申报? |
DNV船级社认证是什么意思? |
2023-03-16
|
查看详情 >> |
天海防务是什么公司(天海防务股份有限公司) |
2023-02-25
|
查看详情 >> |
cape型船舶什么意思(cape船参数) |
2023-02-20
|
查看详情 >> |